Topping out
The term ‘topping out’ refers to the installation of the final piece of structure, or the completion of the roof on a building, bridge or other large construction. It signifies that the structure has reached its maximum height (not that the project has reached completion). In the UK, topping out may be marked by the installation of a plaque or other feature recording the occasion and is often used as a PR event for the media.
The significance of topping out is believed to date back to pre-Dark Age Scandinavia, where folklore suggests there was a practice of placing a tree on top of a new building to appease the tree dwelling spirits of their displaced ancestors. This became a celebration as large numbers of the community would often assist with completing a new building, and it was a way the building owner could show their appreciation. The Scandinavian invaders of the mid-to-late 8th century, introduced the practice to England.
In 14th century England, topping out ceremonies were marked by a yew tree branch being placed at the highest point of the building. Such occasions were included in the writings of the poet Geoffrey Chaucer. Often the personal flag of the owner would be hoisted on top of the building once the shell was complete.
In modern construction, topping out ceremonies are celebrated in different ways around the world:
- Jordan: Builders hold a religious ceremony followed by a feast.
- Denmark: The roof of the building is decorated with evergreen garlands.
- America: The final structural piece is often painted white and signed by members of the construction team.
- Germany: Laurels are hung around the chimney of a new house to acknowledge its ‘birth’.
- Brazil: Branches and leaves are fixed to the building.
- Spain: A flag is raised and all workers are invited to a lunch by the boss.
Media representatives are often present at topping out ceremonies on major projects, invited to attend in order to generate interest in the project, as well as celebrate its progress and the achievement of the construction team.
|
| Prime Minister Tony Blair at the topping out ceremony for the Millennium Dome on 22 June 1998. |
[edit] Related articles on Designing Buildings
- Activity schedule.
- Ceremony.
- Certificate of non completion.
- Completion.
- Completion date.
- End of stage report for construction.
- Final certificate.
- Key dates.
- Handing over possession of the construction site to the contractor.
- Handover to the client.
- Milestones.
- Practical completion.
- Programme for building design and construction.
- Scheduling construction activities.
- Sectional completion.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.




























Comments
Very nice article. I only wished for a picture of the tree in the top of the Scandinavian construction, since it might be an outstanding image!